News | DrumhellerMail - Page #969
10102024Thu
Last updateSun, 06 Oct 2024 1pm

Open house today for solar/battery hybrid project

Solar Panels1

    Longspur Developments is hosting a public open house to discuss a proposal of a hybrid solar/ battery storage development within the town of Drumheller.
    The company is proposing a 13.5 megawatt installation with battery storage near the water treatment plant ponds on town land. Robbie Donaldson managing director for Longspur developments says they have a partner and they have developed a similar one near Innisfail that should be up and running next year.
    “Shortly after that we were looking for another town that might have similar land they might not have plans for or getting income for and Drumheller had some land and were keen to do something,” said Donaldson. “I think it was the town’s desire to try and embrace some sort of renewable project.”
    He said the development will be beneficial for the town in a few different ways. The town will be able to realize revenue on a long term lease to house the facility as well as tax benefits on a piece of land that was vacant. Longspur is also looking at setting up a community benefit fund.
    “From land that was giving them zero could make them in excess of $100,000 a year combined,” said Donaldson.
    Their view is to set up a fund that is managed arm’s length away from the town that will provide about $15,000 a year that residents can apply to for activities or equipment that provides benefit for the wider community,” he said.
    He says the project will be located on about 60 acres, and while 13.5 megawatts is relatively small compared to some of the other local projects, that is more than enough to provide power to a town the size of Drumheller. They will be selling directly to the grid.
    The solar project is self-funded and competes on its own merits, however, the battery storage side of the project is funded by a grant from Emission Reduction Alberta.
    “What is exciting about this project is the battery piece of it,” said Donaldson.
    “Batteries being co-located with generation projects is happening a lot in other parts of the world, and certainly as more renewable generation comes online it does lead to grid stability problems, which can be solved by having a battery,” he explains.
    The open house is to solicit feedback from the community before they go to the Alberta Utility Commission with an application. He says interested parties are welcome to come out and learn more about the project, as are local contractors who might be interested in providing services during the construction.
    The open house is on Thursday, November 7 at the Badlands Community Facility from 4 p.m. to 8 p.m.


Schitt's Creek actor returns to alma mater

IMG 6117

Students at DVSS had the opportunity to interact with former student and professional actor Karen Robinson.

Robinson completed her Grade 12 at DCHS and went on to a long acting career on stage and screen. This includes work in the Stratford Festival and The Citadel Theatre in Edmonton. Most recently she is known as Ronnie Lee on the Emmy Award-winning Schitt’s Creek.

 Robinson tells The Mail, she makes it back to Drumheller a couple of times a year to visit family. She is the sister of well known Drumhellerite Marcel Robinson.

She wished to interact with the students to talk about the path she took in her life, from graduate to college student to professional actor, and how all paths are different.

“It’s not about the destination, it’s about the journey because I think I am here because I ended up at the Emmys and it seems like the endpoint, but in my head it is not the point, the fact that it was just another stop in this life that I strive to keep living," said Robinson.

 She jokes that the presentation was a bit out of her comfort level. While she has been on much larger stages, “but not with my own words!”

Education Minister announces new Morrin School

morrin
    Morrin School is on the list of capital projects for the Alberta government for the coming years.
    On Friday, November 1 the Minster of Education Adriana LeGrange announced a commitment for 25 school projects, including 15 new schools. Morrin was on the list.
    “We are so excited about getting a new school,” said Principal Don Yavis upon hearing the news Friday morning. “It is going to be great, especially a new gymnasium. The kids are going to be over the moon because they have been playing in this gym with the low roof.”
     The Mail reported in March of this year Prairie Land School Division (PLSD) has placed Morrin school as its top priority in its capital plan submitted to the province.
     “Our facilities director, the school board and the division had been working on Alberta Infrastructure for a while because we have had long-time issues here at the school with the old building,” he said.             “We had Alberta Infrastructure here with engineers and they figured it is a lot more feasible to build a new school than to repair the issues we are dealing with. “
    “It’s great news, it’s showing they care about us people in rural Alberta and our kids matter."
     The last major renovation to Morrin School was completed in 1989.
    Yavis said there is no timeline in place. They have Friends of Morrin School Society set up as a fundraising body, and there may be possibilities of further upgrades or opportunities to partner with the community.
    “All we have is an approval, now the work begins,” said Yavis.


Subcategories

The Drumheller Mail encourages commenting on our stories but due to our harassment policy we must remove any comments that are offensive, or don’t meet the guidelines of our commenting policy.