News | DrumhellerMail - Page #5
03302025Sun
Last updateFri, 28 Mar 2025 5pm

Drumheller RCMP seek public assistance locating missing person

picture of Daniel COLEMAN

UPDATE March 19, 2025 1:33 PM:

Drumheller RCMP is advising that Daniel Robert Coleman has been located safe and is well. The RCMP thank the public for their assistance.

 

Drumheller RCMP is seeking public assistance in locating 28-year-old Daniel Robert Coleman. Daniel was last seen on March 16, 2025, in Drumheller, in the 1200 block of South Railway Avenue.
Drumheller RCMP is concerned for his wellbeing and would like to speak with him.
Daniel is described as:
Short sandy brown hair and he has a red beard
6 feet 1 inches tall with slim build
Wears glasses
Unknown clothing description
If you have any information regarding the whereabouts of Daniel, please contact Drumheller RCMP at 403-823-2630. If you wish to remain anonymous, you can contact Crime Stoppers at 1-800- 222-8477 (TIPS), online at www.P3Tips.com or by using the "P3 Tips" app available through the Apple App or Google Play Store.


Carney to be sworn in as next Prime Minister

Screen Shot 2025 03 11 at 9.33.44 AM

In the next few days, Mark Carney will be taking the reins as Prime Minister after winning the leadership of the governing Liberal party.
The question now is for how long?
On Sunday, March 9, the membership of the Liberal Party elected Carney as their new leader. This comes in the wake of Prime Minster Justin Trudeau announcing he would step down.
Many are predicting an election would quickly be called, spurred either by the governing party or a vote of non-confidence.
CPC leader Pierre Poilievre and NDP leader Jagmeet Singh have both indicated they would call for a vote of non-confidence.
In the short time between Trudeau's announcement and Carney’s victory, the political landscape has shifted dramatically.
Looming threats of tariffs by the United States, and changing goalposts every day are making Canadians more and more concerned.
Upon winning, Carney dialled in on the ongoing trade dispute.
“Donald Trump has put unjustified tariffs on what we build, on what we sell, on how we earn a living. He's attacking Canadian workers, families and businesses. We can't let him succeed,” he said. "I'm proud of the response of Canadians who are making their voices heard and their wallets felt. And I'm grateful for how Canadian provinces are stepping up to the fight.”
Just a few weeks ago, the Conservative Party arouds a 20 point lead in the polls and was poised to form the next government. The race has since tightened up, and Poilievre wasted no time in getting his message out and says nothing has really changed.
“The Liberal establishment has installed Justin Trudeau's economic advisor as the next Liberal leader to trick Canadians into giving them a fourth term in power. But he's just like Justin and he's more of the same,” he said. “We have the same Liberal MPs, the same Liberal advisors, the same Liberal promises that will produce the same Liberal results: doubling housing costs, doubling the debt, doubling lineups at food banks, enriching the global elites at the expense of the working class and making our economy more helpless and reliant on the Americans than ever before.”

Phase 2 of Gordon Taylor Bridge work set for April start

IMG 2730

Rehab work on the Gordon Taylor Bridge is anticipated to resume in April 2025.
Alberta Transportation began the two-year project on the bridge to widen the clear bridge and modify existing roadways and connecting paths in May 2024, wrapping up the first phase of work in December 2024–a few months behind the originally estimated fall timeline.
“The project this year includes installation of new deck joints and concrete overlay on the west side of the bridge,” shares Wayne Wood of Alberta Transportation. “Traffic barriers on the bridge will also be replaced this summer, along with sidewalk repairs and resurfacing.”
Additional work to the east side of the bridge will also be completed.
Similar to the first phase of the project, motorists will be restricted to a single lane of alternating traffic across the bridge deck, which will be controlled by signal lights at the north and south end of the bridge.
At this time, Mr. Wood shares construction is anticipated to be complete by October 2025.
Despite delays during the first phase of construction, Mr. Wood says the project is currently on budget of $10.1 million.


Subcategories

The Drumheller Mail encourages commenting on our stories but due to our harassment policy we must remove any comments that are offensive, or don’t meet the guidelines of our commenting policy.